      Current Position : Home > FAQ >
      FAQ

      FAQ of Aerated autoclaved concrete block production(1)

      Author : RuiGuang    Time : 2013-11-26    Click :
      Q:1. Due to the high cost of Fly Ash  We compelled to use ground (crushed) Sand: 
      a. Can we replace 100% fly ash by Sand
       
      A: 100% yes
       
      Q:b. Do we have to use separate ball mill for sand grinding (instead of Lime grinding ball mill) – What are the specification for sand grinding ball mill & cost? 
       
      A:  Yes,two separate ball mills are necessary for sand grinding and lime griding .
                              Φ900x3000 for  lime and Φ1200x4500 for sand.
       
      Q:c.   What are the rated output capacity of ball mill for lime and sand grinding? 
      A:
      Model Ball capacity
      (t)
      Feeding
      Siz(mm)
      Discharging 
      Size
      (mm)
      Capacity
      (t/h)
      Motor
      (kw)
      Weight
      (kg)
      Φ900x3000
      (dry type)
         2.5 ≤20 0.075-0.89  1.2    22    11.5
      Φ1200x4500
      (wet type)
         7 ≤25 0.074-0.4    5    55     13.8
       
       

      Q:2. For conversion of CaCO3 (Limestone) to CaO (Lime) if we are using incinerator / Kiln 
      a. What is the efficiency of conversion process?
       
      A:Generally speaking,1Mt CaCO3 can make 400kg-600kg CaO.
       
      Q:b. What is the rate of fuel consumption (Coal) by Kiln (for 1Mt of Lime)
       
      A:For 1 Mt lime we need 180kg-200kg coal as heating source ,the coal consumption also depends on the heating value,normally the coal heating value should be no lower than 4500 kcal.
                         My question:If you are willing to set up this plant with capacity 100m3/day and not   intend to expand the capacity in short time,it’s better and cost-efficient to buy the finished quicklime product rather than setting your own quicklime production plant.Unless you can get the limestone for free.
                          Simple caculation:1m3 AAC block  production cost 130kg lime.
      Whole year capacity 35,000 m3 cost 35,000x0.13=4550 Mt,please refer the quicklime and lime stone price in your local market and find out if my suggestion is available.
      Q:3. Ball mill re-charging
      a. What is the usual rate of recharge of lime and sand grinding ball mills? 
       
      A:Normally the filling ratio of the ball mill is between 30%-40%.For the ball load,we can calculate by the formulation:
      Q=π/4D2.L.φ.γ
      1.D stands for inner diameter of the ball mill
      2.L stands for ball mill length
      3.φ stands for ball filling ratio
      4.γ  stands for ball density

       
      Q:4. Autoclave process
      a. What is the fuel (coal) consumption rate of autoclave per 1M3 of AAC block.
       
      A:We need 2 T automatic furnace for the autoclave and the consumption is 1.5 ton per day.
       
      Q:5. Estimated Man power for proposed plant
      a. Machine operators
      b. Direct Labor
       
      A:10 people/shift,20 workers for 2 shifts in total.
       

      男女做爰全过程的视频
    5. <u id="9n7fx"></u>

      1. <table id="9n7fx"></table>
      2. <u id="9n7fx"></u>
          <video id="9n7fx"></video>
      3. <object id="9n7fx"></object>
        <center id="9n7fx"></center>
      4. <big id="9n7fx"><em id="9n7fx"><track id="9n7fx"></track></em></big>
        <big id="9n7fx"></big>